Malaysia’s High Court ruled on 30 April that earthworks and slope alterations for Sycal’s planned Genting Sky City were unlawful, in a case brought by Genting companies. It ordered MYR2m in costs and MYR243,800 in damages, required restoration within six months and barred further unauthorised works; the defendants have appealed parts of the ruling.

Genting Bhd has obtained a High Court injunction in a dispute with Sycal Bhd, a Malaysian developer, concerning a proposed project near Resorts World Genting’s First World Hotel. The court found the project’s earthworks and slope changes unlawful and ordered the affected slopes restored. The defendants have challenged parts of the ruling in an appeal pending before the Court of Appeal.

The court found that the works lacked valid permissions and breached permissions from the local authority. It also declared the proposed development contrary to the Town and Country Planning Act 1976, the Street, Drainage and Building Act 1974 and the National Council of Local Government’s Guidelines on Development Planning in Hills and Highlands. A mandatory injunction sets a deadline of 6 months from the judgment for restoring the affected slopes. Backfilling will use blockstones at least 9 inches in size. The defendants were prohibited from further unauthorised construction, slope alterations or excavation and from using support structures associated with the works.

The suit was brought in early 2020 by Genting Highlands Bhd, Genting Malaysia Bhd and their subsidiary First World Hotels and Resorts Sdn Bhd. The plaintiffs argued that the proposed development could affect the hotel’s structure. Genting claimed that earthwork and slope cutting could make the slopes unstable and harm its properties. The allegations covered nuisance, trespass and negligence, as well as breaches of planning and construction laws.

Sycal and its subsidiary GM Aero Support Sdn Bhd plan to construct Genting Sky City about 100 metres northeast of the hotel. The development comprises 10 blocks of hotels and business units ranging from 27 to 56 storeys, including parking lots.

Judge Aliza said the evidence showed safety issues in the slope area. The appointed expert found safety issues concerning the strength of the slopes before development began. The judge considered water leakage, drainage and the loss of supporting occupied structures, the outer ring road and related facilities.

The judge refused Genting’s application for exemplary damages but awarded general damages for slope damage. The defendants were ordered to pay MYR243,800 in general damages and MYR2 million in costs. She dismissed the defendants’ counterclaim that the lawsuit was an abuse of court process. The defendants claimed the suit was intended to block development and eliminate competition at the hillside resort.

Related company prices

Latest reported results

Genting Malaysia Bursa Malaysia: 4715

Quarter ended 31 December 2025

Revenue
MYR 3.01bn

Request a correction

Flag an issue

Keep reading

Business

Fitch flags leverage pressure at Asia-Pacific gaming operators

Fitch said slower earnings growth and heavy capital spending are keeping leverage high among gaming operators in Asia-Pacific, with recent downgrades linked to company-specific pressures. It expects Genting Bhd’s net leverage to remain above 4.0 times over the next three years and Genting New York’s annual capital spending to average around US$800 million over the medium term.

Continue reading